Project Description
Financial Project Number: 452074-1
The Interstate 75 (I-75) Auxiliary Lanes Project is located between State Road (S.R.) 200 and S.R. 326. The project will add an auxiliary lane in each direction along I-75 within the project limits, as well as reconstruct the SW 20th bridge in Marion County.
This project is one of two Moving Florida Forward Infrastructure Initiative Projects (fdot.gov/movingfloridaforward), which allowed FDOT to advance the much-needed improvements, with construction anticipated to begin in Fall 2025.
The Design-Build team will coordinate with the project team for the construction work for the adjacent project FPID 452074-2, I-75 South Improvements Project from S.R. 44 to S.R. 200. The team will also coordinate with other bridge reconstruction projects within the project limits, S.R. 40, and S.R. 326.
Project SCHEDULE
| Phase | Status |
|---|---|
| PD&E Study: | Completed 2024 |
| Design: | Completed in Mid-2025 |
| Right of Way: | 2025 |
| Construction: | Started in Fall 2025 |