Project Description
Financial Project Number: 452074-2
The Interstate 75 (I-75) Auxiliary Lanes Project is located between south of State Road (S.R.) 44 and S.R. 200. The project will add an auxiliary lane in both directions along I-75 within the project limits, as well as reconstruct the S.R. 44 bridge in Sumter County. The overpass bridges along I-75 and County Road (C.R.) 462, C.R. 475 and SW 66th also will be replaced in Sumter and Marion Counties.
This project is one of two Moving Florida Forward Infrastructure Initiative Projects (fdot.gov/movingfloridaforward), which allowed FDOT to advance the much-needed improvements. Construction began February 2025 and will be ongoing through 2028/2029.
The Design-Build team will coordinate with the project team for the construction of the adjacent project, FPID 452074-1, I-75 North Improvements Project from S.R. 200 to S.R. 326.
Project SCHEDULE
| Phase | Status |
|---|---|
| PD&E Study: | Completed in 2024 |
| Design: | Ongoing |
| Right of Way: | 2025 |
| Construction: | Began February 2025 and will be ongoing through 2028/2029 |
Project Information
Resources
Project Manager
Andy Healy, P.E.